Angus Meek Architects
2496 3D View 05 20170616.jpg

Harbour Crescent Phase 2


HARBOUR CRESCENT PHASE II

Residential Development

Full planning permission granted for 93 contemporary apartments arranged in two blocks of four storeys, above integrated undercroft parking at ground floor level.

Harbour Crescent Phase 2 is a vacant plot of land situated on the edge of the Portishead Business Centre redevelopment, including the recently renovated industrial building converted to housing (Harbour Crescent Phase I).

The development offers a key opportunity to reinforce the positive effect and change to this neighbourhood that will be brought about by the reinstatement of the adjacent Portishead railway and to complete the site as a residential development to serve the growing population of Portishead.

The proposed site layout places built form to the perimeter of the developable area which maximises the available area of contiguous open space that can be provided proportionately to the development.